Page 129 - Final Draft_Casestudies_17June2019_new
P. 129

[DRAFT]

           badly affected. The other issues which used to keep faculty and the students on tenterhooks were the lack
           of drinking water, gender-specific washrooms, library etc.

           The  demand  for  the  development  of  the  infrastructure  geared  up  after  the  concerned  stakeholders
           expressed the need for the same. Subsequently, a meeting was convened in the principal‘s chamber and
           necessary  way  out  for  the  plan  was  discussed  by  means  of  threadbare  discussion  with  the  community
           including Auqaaf (local governing body of senior citizens) and the Panchayat members after making them
           realize the ownership of the institution.





















                                           A view of newly build academic block

           The outcome appeared fruitful. Through proper persuasion by the office of this institution a humongous
           contribution was made by the community by providing an amount of rupees 89 lac which was utilized for
           the construction of much needed two storey academic block with the capacity of eight spacious rooms
           including  the  examination  hall.  The  whole  process  was  proceeded  officially  by  taking  the  District
           Development Commissioner and the Chief Education Officer on board for the same. This move generated
           the public applaud and is still being weighed as an amazing step to be taken ever in the district.



















              The  then  worthy  Chief  Education  Officer       The then ADC Anantnag on his inspection
              on his inspection visit to this institution        visit to this institution




           122 | P a g e
   124   125   126   127   128   129   130   131   132   133   134