Page 130 - Final Draft_Casestudies_17June2019_new
P. 130
[DRAFT]
And many other such developmental initiatives were followed and successfully accomplished as well.
Face-lifting of older building, availability of drinking water and likewise activities were completed with
an utmost ease.
Prior to this major developmental work, in 2015 soon after I joined this institution I called upon the then
local MLC Honourable Dr Bashir Ahmad Veeri and apprised him about the dire need of infrastructural
development. He made a visit to the school and after spot verification an amount of Rs 18.80 lac were
granted from the Constituency Development Fund, from which the following infrastructural
developmental works were executed and accomplished:
Serial Name of the work Estimated cost
No. in lacs
1 Construction of Canal with foot crossing and bed treatment. 8.50
2 Leveling of ground/playfield/lawns. 1.00
3 Beautification of parks. 3.00
4 Fencing 3.00
5 Construction of concrete path with tile flooring. 3.3
Total 18.80
The then Honorable MLC Dr. Bashir Ahmad Veeri (centre) on his visit to this
Institution in 2015.
123 | P a g e