Page 130 - Final Draft_Casestudies_17June2019_new
P. 130

[DRAFT]

           And  many  other  such  developmental  initiatives  were  followed  and  successfully  accomplished  as  well.
           Face-lifting of older building, availability of drinking water and likewise activities were completed with
           an utmost ease.

           Prior to this major developmental work, in 2015 soon after I joined this institution I called upon the then
           local MLC Honourable Dr Bashir Ahmad Veeri and apprised him about the dire need of infrastructural
           development. He made a visit to the school and after spot verification an amount of Rs 18.80 lac were
           granted  from  the  Constituency  Development  Fund,  from  which  the  following  infrastructural
           developmental works were executed and accomplished:

           Serial                           Name of the work                          Estimated  cost

           No.                                                                        in lacs

               1      Construction of Canal with foot crossing and bed treatment.           8.50
               2      Leveling of ground/playfield/lawns.                                   1.00

               3      Beautification of parks.                                              3.00

               4      Fencing                                                               3.00
               5      Construction of concrete path with tile flooring.                     3.3

                                                  Total                                    18.80































                      The then Honorable MLC Dr. Bashir Ahmad Veeri (centre) on his visit to this
                                                     Institution in 2015.






           123 | P a g e
   125   126   127   128   129   130   131   132   133   134   135