8. Launched novel competitive activities for the students as drawing, essay writing, slogan
writing, rangoli designing, making mehndi patterns, uses of waste material etc to boost up
their inner capacity, communication skill and confidence. To build their potential we
introduced some new festivals as Kite Festival, Sports Day, Quiz Day, Carrier Day etc.
9. School Assembly was reorganized HOUSE-WISE to ensure active participation of every
student, class and teacher as we believe that ―WELL BEGUN IS HALF DONE.‖
10. As a healthy practice we introduced positive feedback in the form of note books, story
books dictionaries, pens, pencils, tiffin‘s etc. so as to maintain their self respect.
Visible Results of Transformation
Changed Situations / Achivements of Us
Progressive metamorphosis is visible in the improved look of the school in all spheres, e.g.
academics, co- curricular activities, extra- curricular activities, infrastructure up gradation and
community participation.
1. As a result of sincere and steady efforts of the team in the session 2018-19 the total
strength of the students in the school has gone up from 105 to 750.
2. Due to encouragement of the students for playing different games like hockey and
football in addition to kho–kho and kabaddi, it became possible that 21 students of the
school have been selected in the state teams of hockey and football.
3. We organized The District level Football Tournament in the year 2016-17. As many as 25
teams and 400 players of Jaipur district participated in the tournament. This was for the
first time in the history of such event was organized successfully in the school of rural
area. The event developed enthusiasm among students and stakeholders.
4. The number of classrooms has gone up from 9 to 21 which is indeed a significant
addition to the school building. The whole building has acquired a new look by
undertaking distemper and renovated as per the contemporary needs. For instilling moral
values among the students installed flax board bearing inspiring quotation.
5. Got the water tank reconstructed and 2100 metres long pipe line was laid down for proper
supply of drinking water in all the corners of the school campus. This major task in the
school was accomplished with the active financial and manual supports of the
stakeholders. At present 37 taps of drinking water, with the additional facility of water
cooler, have been installed at different places in the school campus.
6. All room is furnished with light and adequate fans.
7. Two complete units of toilets for girls and one complete unit of toilet for boys now exist.
Separate toilets for gents and ladies for staff are available.
8. Got a 30x40 feet hall constructed for multipurpose activities of the students and staff.
218 | P a g e