Page 226 - Final Draft_Casestudies_17June2019_new
P. 226
[DRAFT]
9. Flower beds add charm to the school building.
10. About 500 trees have been planted and all of them survive by the active care of staff and
students.
11. Office of the school has been well equipped well furnished and well managed with IT.
12. The school result in the past 3 years has remained 100%.
13. Established collaborations with Prof. G. K. Jain from prank university, America for
introducing three novel practices. Firstly the provision of scholarships has been made for
th
th
the meritorious students of the classes of 5 , 8th, 10th and 12 . Secondly every year 5-10
students of the school are given an opportunity to visit American schools so that they can
understand their teaching learning concepts and thirdly the innovative concept of a smart
class has been introduced.
14. In 2017-18 we organized STRANT WAKPEETH MEET FOR PRINCIPALS OF
SENIOR SECONDARY SCHOOLS in which500 principals of schools of Jaipur district
participated. The meet was a grand success. It was indeed a wonderful experience for the
teachers, students and community to accomplish such difficult task and drive a fresh
breath in environment.
15. To continue the charity and initiate stake holders
a) I donated Rs. 5.15 lakh in the year 2016-17,
b) Rs.1 lakh in the year 2017-18
c) as a dutiful daughter of my father I voluntarily came forward in the current session 2018-
19 to have a PRAYER SHADE ( size 80x80 feet) constructed in the school in the
memory of my Father Late Shri N.R. Bhardwaj. I incurred an expenditure of Rs. 6.80
lakh on this construction work.
16. Our stake holders have donated Rs. 6.60 lakh for construction work and enrichment of
infrastructure. With our endeavours the MLA contributed Rs 10 lakh and the MP
contributed 7 lakh from their funds for construction work in the school.
Further Areas for Change/ Transformation AREAS OF SCHOOL THAT WE WANT TO
TAKE UP NEXT FOR CHANGE:--
1. Solar plant to be installed.
2. labs (physics, biology and chemistry) to be constructed.
3. Stadium for hockey to be developed
4. ICT room to be developed.
5. A reading room to be developed for students to enhance their reading habits and widen
their vision of life.
6. Kindergarten to be developed for kids.
7. Heritage looks of premises to be retained.
8. Career counselling centre to be launched.
219 | P a g e